Concrete Worker Resume Example and Template
Before a ready-mix truck backs up to a sidewalk job, someone has torn out the old slab, graded the base and staked the forms. American contractors post this work as Concrete Finisher or Concrete Laborer: of the eleven postings read for this page, eight have Finisher in the title and one says Concrete Worker. Nine of the eleven write forms or forming into the duties.
All eleven employers are private, and none is a masonry contractor, where the federal occupational handbook, which counts this trade with masonry workers, places 19 percent of the group. On your resume, name what you poured and every step of the pour that was yours, from subgrade to saw cut.
A complete, realistic Concrete Worker resume, laid out in an ATS-tested template. The candidate is illustrative: the name, employers and figures were written for this example and identify no real person, so you can copy its structure and wording freely.
Updated October 2026
Also searched as
Concrete Finisher, Concrete Laborer, Concrete Laborer / Finisher, Concrete Finisher Patcher, Concrete Skilled Laborer, Commercial Concrete Worker
Antonio Sanchez: Concrete Finisher
Austin, TX, United States
Summary
Concrete finisher with 8 years in flatwork: 3 on residential driveways, patios and steps and 5 on city sidewalk, curb and gutter, curb ramps and commercial slabs on grade. Every step of the pour, from tear out and forms to joints and cure. Own finishing tools and PPE, Texas driver's license, own truck, OSHA 10. English and Spanish.
Work Experience
Concrete Finisher and Form Setter, Blanco Ledge Concrete
Jan 2022 – Present. Commercial and municipal flatwork contractor, about 45 employees
- Tear out, grade and compact base, set and stake forms, then place, screed, bull float, edge, joint and broom city sidewalk and driveway approaches on a six-person crew under a foreman, 3 to 4 pours a week of 15 to 45 cubic yards, off the chute or by buggy
- Formed and finished 96 curb ramps on 2 city sidewalk contracts since 2023: set running and cross slopes from the plan sheets with a digital level before each pour, set the detectable warning panels and broomed across the slope
- Hand-formed and finished curb and gutter on the same 2 contracts and on 9 parking lots, setting form heights from grade stakes and string line
- Placed and finished shop and warehouse slabs on grade of 2,000 to 6,000 square feet from a pump: tied rebar and set wire mesh, ran a walk-behind power trowel, cut control joints with an early-entry saw the same day and sprayed curing compound
- Started summer pours at 5 a.m. and split long sidewalk runs into smaller placements so the crew could close the surface before it set
- Chipped out and patched rock pockets and honeycomb on curb faces after stripping forms, and ground down high spots at joints
Concrete Laborer, then Finisher, Salado Bank Concrete
Aug 2018 – Dec 2021. Residential concrete contractor, 12 employees
- Hired as a laborer: broke out old driveways and patios with a jackhammer and skid steer, graded and compacted base with a plate compactor, set forms and wheeled concrete where the truck could not reach
- Finishing from spring 2020: bull floated, edged, hand troweled and broomed driveways, patios, walkways and steps on a four-person crew, 2 to 3 houses a week
- Stamped and colored 30 patios and pool decks with integral color and powdered release, then washed and sealed them after cure
- Drove the crew truck and tool trailer to each job on a Texas Class C license
Education
Cibolo Bend High School
High School Diploma, General studies. Aug 2014 – May 2018
Skills
Form setting and stripping (sidewalk, curb and gutter, slab edge), Grading and base compaction (plate compactor, skid steer), Rebar and wire mesh, Screeding and bull floating, Edging and jointing, Hand troweling and walk-behind power trowel, Broom finish, Stamped and colored concrete, Joint cutting with an early-entry saw, Curing compound, Patching and grinding, Reading plans and grade stakes
Languages
English, Spanish
Certificates and Awards
- OSHA 10-Hour Construction, OSHA Outreach Training Program, 2022
What employers in the United States expect on Concrete Worker resumes
This page is written for the job market of the United States. A resume for the same job in another country follows different rules.
- Seven of the eleven postings require earlier concrete or construction experience, one takes experience and/or training, two prefer it and one lists none among its requirements. Say in the summary how long you have poured and what: sidewalk, slabs, walls.
- Three postings require a stated number of years (1 to 3, 2, and 3 or more), one requires 2 years of experience and/or training, one prefers 3 years of construction and six give no number. Put your own number first in the summary, counted from your first season on a concrete crew.
- No posting requires an apprenticeship, a trade license or a named concrete certification. The one safety certification named is OSHA 10, preferred by one employer. If you hold it, list it with the year you took the course.
- A valid driver's license is required in two postings, preferred in two and not mentioned in seven, and six require reliable transportation. Write the license with its state and say you get to job sites in your own vehicle.
- One staffing firm requires that you bring your own finishing tools (mag floats, trowels, edgers), and one contract posting for placement and repair work requires your own hard hat, safety glasses, gloves, high-visibility vest and work boots. If you own a set, one line saying so answers both.
- English and Spanish together are called a strong plus in two postings. If you work in both on the crew, list both languages by name.
Resume rules for the United States
Writing your Concrete Worker resume
- Draft one: a finisher's resume that starts when the truck arrives
- Sidewalk, curb and gutter, footings or barrier wall: the second draft says what was poured
- Trowels, patching and cure: what the third draft does with the skills list
- Own tools, a license and a ride: the fourth draft reads the Requirements block
- When the opening says Laborer or Carpenter and the work is still concrete
Draft one: a finisher's resume that starts when the truck arrives
Imagine a finisher eight years into flatwork in central Texas, three of them on driveways and patios and five on city sidewalk and commercial slabs, who wants to move to a larger contractor. He is an illustration, made up to show how a resume for this work improves over four passes. His first draft opens with a summary: skilled concrete worker, proficient in all finishing techniques from broom finish to high-gloss polish, more than 120 projects totaling 850,000 square feet. The jobs underneath say he executed finishing techniques and managed curing.
Hold that against the eleven postings read for this page. None of them gives a square footage, for the job or for the applicant. What they print is a sequence. Nine write forms or forming into the duties, and eight list grading, digging or preparing the ground, although eight of the eleven carry the word Finisher in the title. A residential contractor's Concrete Finisher posting writes it out as 'all steps of concrete construction': tear out of existing concrete, basing, forming, finishing, and grading and seeding. Finishing is one step in five there. The first draft describes the last hours of a day that these employers describe from the first stake.
Weak: Executed finishing techniques ranging from broom finish to troweled surfaces, adapting techniques to concrete conditions and weather variables.
Strong: Tear out, grade and compact base, set and stake forms, then place, screed, bull float, edge, joint and broom city sidewalk and driveway approaches on a six-person crew under a foreman, 3 to 4 pours a week of 15 to 45 cubic yards, off the chute or by buggy.
The weak line begins with the trowel and could have been written by someone who has never driven a form stake. The rewrite walks the pour in the order it happens, so a foreman can see which steps this person has done and which he would need to be shown. It also gives the crew size and the yards in a pour, read from the delivery tickets, and it names what was poured, which is the business of the second draft.
Sidewalk, curb and gutter, footings or barrier wall: the second draft says what was poured
Six of the postings name the concrete itself: sidewalks, curbs, gutters, pads and ADA ramps at a sidewalk contractor; footings, slabs, walls and foundations at a commercial one; patios, steps, walkways and driveways at a residential one; barrier wall and curb and gutter at a highway paving contractor; sidewalks, pads, curbs and slabs in a contract posting for placement and repair work; slabs, sidewalks, foundations, curbs and driveways at a contractor that does both houses and commercial sites. The sidewalk contractor requires that its finisher know the ADA requirements for ramps, landings and transitions or be willing to learn them. The highway contractor wants the surface finished without voids by someone who keeps tools and body clear of the string line. These are different crews, and a total of square feet does not say which of them you have worked on. The name of the element does.
So the second draft sorts the eight years by what came out of the forms. The residential years become driveways, patios, walkways and steps. The later years become city sidewalk, hand-formed curb and gutter, curb ramps, and slabs on grade for shops and warehouses. Where a figure helps, it is one he could read off a plan sheet or a delivery ticket: the number of ramps on a contract, the yards in a pour, the size of one slab.
Weak: Finished 280,000 square feet of commercial concrete including polished concrete floors, decorative work, and specialty applications for high-end commercial properties.
Strong: Formed and finished 96 curb ramps on 2 city sidewalk contracts since 2023: set running and cross slopes from the plan sheets with a digital level before each pour, set the detectable warning panels and broomed across the slope.
A total of 280,000 square feet cannot be traced to any one job, and the line hides what the work was behind three vague nouns. Ninety-six ramps on two city contracts is a count from the job, and ramps are the work whose requirements the sidewalk contractor asks its finishers to know. The polished floors come out because he helped on two and finished neither.
Where a square foot figure still belongs
Keep an area when it sizes one piece of work: a shop slab of 6,000 square feet tells a reader how much concrete had to be placed and troweled before it set. Drop it when it is a career total. A sum across 120 jobs mixes patios with warehouse floors and tells a foreman nothing about either.
Trowels, patching and cure: what the third draft does with the skills list
The first draft's skills are twelve nouns, among them weather adaptation, equipment operation and specialty concrete. Five postings name trowels, hand or power, so trowel work stays, but inside a list that follows the pour from the ground up. Four include repairing or patching concrete, and four mention curing, as a duty or as knowledge they prefer. Five mention reading plans, drawings or layouts. Each of those is a line the third draft can answer with something he did, in this order.
- Form setting and stripping, with what was formed: sidewalk, curb and gutter, slab edge. It goes first because it happens first.
- Grading and base compaction, with the machine he ran for it, a plate compactor and a skid steer.
- Rebar and wire mesh next, because the steel is tied and set before the concrete arrives.
- Screeding, bull floating, edging and jointing, written as four words in place of the single word finishing, since each is a different tool in the hand.
- Hand troweling and the power trowel, named as walk-behind, then broom finish for exterior work.
- Joint cutting and curing compound, the two things done after the surface is closed.
- Patching and grinding: rock pockets and honeycomb found when the forms come off, chipped out and patched.
- Reading plans and grade stakes last, backed by a bullet in the job above that shows form heights set from the stakes.
Weather adaptation goes. One contractor says what the phrase is reaching for: its finisher monitors setting times and adjusts technique to the weather and the mix. On a resume that is a bullet about a real day. His reads that summer pours started at 5 a.m. and long sidewalk runs were split into smaller placements, so the crew could close the surface before it set. Equipment operation becomes the names of the machines, and specialty concrete becomes the one specialty he has finished himself, stamped and colored patios, with a count.
Own tools, a license and a ride: the fourth draft reads the Requirements block
Below the duties these postings turn practical, and three drafts have answered none of it. A staffing firm that places finishers with contractors writes that the worker must have basic hand tools and finishing tools, and names mag floats, trowels and edgers. A contract posting for placement and repair work requires the worker's own hard hat, safety glasses, gloves, high-visibility vest and work boots. Six require reliable transportation. A driver's license is required in two and preferred in two more, and two call English and Spanish together a strong plus. None of it is skill, and each item takes a few words to answer.
He owns a set of hand tools, drives the crew truck with a trailer and speaks both languages on the crew, so the fourth draft moves those facts into the summary, beside the OSHA 10 card that one posting prefers. The summary also loses its adjectives. Skilled and expert are his own opinion of himself. Eight years, the elements he has poured and the steps he does are things a foreman can ask him about on the tailgate.
The summary after four drafts: Concrete finisher with 8 years in flatwork: 3 on residential driveways, patios and steps, 5 on city sidewalk, curb and gutter, curb ramps and commercial slabs on grade. I work every step of the pour, from tear out and forms to joints and cure. Own finishing tools and PPE, Texas driver's license, own transportation, OSHA 10. English and Spanish.
When the opening says Laborer or Carpenter and the work is still concrete
Two general laborer postings were read beside the eleven, both from restoration contractors. Their lists run across trades: demolition, framing, flooring, painting and drywall in one, site cleanup, loading materials and handing tools to tradespeople in the other, and neither names a float, a trowel or a form. Two commercial carpenter postings were read as well. Both are about framing and doors, with trim at one and millwork at the other, and concrete appears once, as forms to be lifted. Each comparison is two postings wide, so read the duties of the opening in front of you before deciding which resume it wants.
My title was Concrete Laborer but I finished. What do I call myself?
Write the title you were paid under and let the bullets carry the trowel. A line such as Concrete Laborer, then Finisher, with the season you moved, is true and tells a foreman how long you have closed a surface yourself. Under it, give the laborer years their own bullet: breaking out, grading, setting forms, wheeling concrete. For an opening whose duties stop at cleanup and loading, lead with the forms, the grading and the machines you ran, and keep the finishing to one line.
How this page was written
This guide is built on 11 job postings for this role, read in October 2026 on Paylocity, Workable, iCIMS, and TradesmenUp. It was written with AI assistance, and each requirement, tool and credential it names was checked against those postings and the references below. The resume above was written for this page and describes no real person.
The postings read for this page
- commercial concrete and general contractor (Paylocity), published 2026-08-12
- environmental services and workforce firm (Workable), published 2026-07-29
- construction staffing and onboarding firm (Workable), published 2026-09-18
- national skilled trades staffing firm (iCIMS), published 2026-04-28
- national specialty concrete contractor (TradesmenUp), published 2026-08-11
- residential and commercial concrete contractor (TradesmenUp), published 2026-06-23
- highway paving and flatwork contractor (TradesmenUp), published 2026-07-22
- sidewalk and flatwork concrete contractor (TradesmenUp), published 2026-06-16
- residential concrete contractor (TradesmenUp), published 2026-09-05
- commercial and residential concrete contractor (TradesmenUp), published 2026-07-22
- residential and commercial building contractor (TradesmenUp), published 2026-08-13
References: BLS Occupational Outlook Handbook, O*NET OnLine
Resume tips for this job
- Give pour size in cubic yards from the delivery tickets, as in pours of 15 to 45 yards, and say whether the concrete came off the chute, by buggy or through a pump.
- For curb and gutter, write whether you set the forms by hand or finished behind a curb machine. The example says hand-formed.
- Name the power trowel as walk-behind or ride-on and give the size of slab you ran it on, since the words power trowel alone do not say which machine.
- List the driver's license with its state and class, and add the trailer if you tow one to the job, as the example does.
Common questions
Should stamped, decorative or polished concrete go on the resume?
Only what you finished yourself, and by name. One residential contractor calls stamped and dyed concrete experience a plus, and none of the eleven postings names polished concrete. A count of stamped patios, with the color and release method, says more than the word decorative. The example gives 30 patios and pool decks.
All my concrete experience is on houses. Can I apply to a commercial contractor?
Read the experience line first. One contractor requires its three or more years of finishing to be on commercial or industrial projects. If your years are residential, say so plainly and bring forward what carries over: work set from plans and stakes, pours taken from a pump, joints you cut, any slab for a shop or garage with its size.